CNCTech Global

Our newest industrial complex, located at the heart of Ba Thien Industrial Park, Vinh Phuc.

VINH PHUC, BA THIEN ICNCTech Global

CNCTech Global is located on an area of 16 hectares in the center of Ba Thien 1 Industrial Park, Vinh Phuc. With a total investment of VND 1,700 billion, the CNCTech Global Complex has a scale equivalent to 20 football fields.

BA THIEN I IP.
247 Ha

GLOBAL COMPLEX
16 Ha

PROPERTY TYPES
Factory / warehouse
Ready or Built-to-Suit

DURATION
2022 – 2023

PROXIMITY
8 IP. in 10km radius
10 km to Noi Bai Airport
40 km to Hanoi
180 km to Hai Phong Port

BA THIEN I IP.
247 Ha

GLOBAL COMPLE
16 Ha

PROPERTY TYPES
Factory /warehouse
Ready or Built-to-Suit

DURATION
2022 – 2023

PROXIMITY
8 IP. in 10km radius
10 km to Noi Bai Airport
40 km to Hanoi
180 km to Hai Phong Port

Specification

04 plans from small to big: Sapphire, Ruby, Beryl, and Diamond.
  • SAPPHIRE
  • RUBY
  • BERYL
  • DIAMOND

AREA
1st floor: 15.000 sq.m
Mezzanine: 2.650 sq.m

HEIGHT & FLOOR LOADING
1st floor: 6 m, 4 ton / sq.m
Mezzanine: 6.8 m, 1.5 ton / sq.m

WIDTH X LENGTH
100 x 200 m

COLUMN SPAN
12 x 33 m

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
2.000 kVA

OCCUPANCY
25%

SAPPHIRE 2

AREA
1st floor: 15.000 sq.m
Mezzanine: 2.650 sq.m

HEIGHT & FLOOR LOADING
1st floor: 6 m, 4 ton / sq.m
Mezzanine: 6.8 m, 1.5 ton / sq.m

WIDTH X LENGTH
100 x 200 m

COLUMN SPAN
12 x 33 m

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
2.000 kVA

OCCUPANCY
25%

SAPPHIRE 2

AREA
4buildings, each building has 3 floors
Area of each floor: 5.000 sq.m

HEIGHT & FLOOR LOADING
1st floor: 6 m, 4 ton / sq.m
2nd floor: 5 m, 1.5 ton / sq.m
3rd floor: 4 m, 1 ton / sq.m

WIDTH X LENGTH
100 x 200 m

COLUMN SPAN
12 x 33 m

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
2.000 kVA

OCCUPANCY

Ruby Project 1

AREA
4 buildings, 3 floors each
Area of each floor: 5.000 sq.m

HEIGHT & FLOOR LOADING
1st floor: 6 m, 4 ton / sq.m
2nd floor: 5 m, 1.5 ton / sq.m
3rd floor: 4 m, 1 ton / sq.m

WIDTH X LENGTH
100 x 200 m

COLUMN SPAN
12 x 33 m

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
2.000 kVA

OCCUPANCY


Ruby Project 1

AREA
1st floor: 28,560 sq.m
2nd: 28,560 sq.m
Mezzanine: 426 sq.m

HEIGHT & FLOOR LOADING
1st floor: 9.3 m, 4.0 ton / sq.m
2nd: 12.8 m, 4.0 ton / sq.m
Mezzanine: 4.0 m, 1.0 ton / sq.m

WIDTH X LENGTH
135.7 x 210.76 m

COLUMN SPAN
12 x 33 m

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
2.000 kVA

OCCUPANCY


CNCTech Beryl 2

AREA
1st floor: 28.560 sq.m
2nd floor: 28.560 sq.m
Mezzanine: 426 sq.m

HEIGHT & FLOOR LOADING
1st floor: 9.3 m, 4.0 ton / sq.m
2nd floor: 12.8 m, 4.0 ton / sq.m
Mezzanine: 4.0 m, 1.0 ton / sq.m

WIDTH X LENGTH
135.7 x 210.76 m

COLUMN SPAN
12 x 33 m

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
2.000 kVA

OCCUPANCY


CNCTech Beryl 2

AREA
TBC

HEIGHT & FLOOR LOADING
TBC

WIDTH X LENGTH
TBC

COLUMN SPAN
12 x 33 m

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
2.000 kVA

OCCUPANCY


DIAMOND 2

AREA
TBC

HEIGHT & FLOOR LOADING
TBC

WIDTH X LENGTH
TBC

COLUMN SPAN
12 x 33 m

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
2.000 kVA

OCCUPANCY


DIAMOND 2

In the Neighborhood

Neighbor 1
Neighbor 3
Neighbor 2
Neighbor 4
Neighbor 5

Book to Visit

or ask for more detail.

    Workers at construction site

    Project Development

    2022

    08/2022

    Groundbreaking Ceremony of CNCTech Global Industrial Complex.

    8/2022 – 12/2022

    Ruby R1 is under construction, expected to be handed over to customers in December, 2022.

    [bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

    2023

    09/2022 – 02/2023

    Sapphire is under construction, expected to be handed over to customers in February, 2023.

    03/2023

    CNCTech will continue to implement the remaining projects.

    [bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

    2024

    Finish

    CNCTech Global Complex is expected to complete in early 2024.

    [bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

    CONTACTLooking for a place
    for your business in Vietnam?

    WE CAN HELP WITH THAT

    Thang Long III IP., Binh Xuyen, Vinh Phuc, VN
    (+84) 866 505 509
    industrial@cnctech.vn

    © Copyright CNCTech Group. Privacy Policy