CNCTech Thang Long

The first Vietnamese investor in a Sumitomo's Industrial Park. This complex hosts our main manufacturing operation in Northern Vietnam, a large bonded warehouse, and our headquarters.

VINH PHUC, THANG LONG IIICNCTech Thang Long

CNCTech Thang Long covers 8.3 ha at the golden location of Thang Long Industrial Park III with a total investment of nearly 500 billion VND.

THANG LONG III IP.
213 Ha

THANG LONG COMPLEX
8,3 Ha

PROPERTY TYPES
Factory / Warehouse
Ready or Built-to-Suit

DURATION
2020 – 2021

PROXIMITY
8 IP. in 10km radius
10 km to Noi Bai Airport
40 km to Hanoi
180 km to Hai Phong Port

THANG LONG III IP.
213 Ha

THANG LONG COMPLEX
8,3 Ha

PROPERTY TYPES
Factory / Warehouse
Ready or Built-to-Suit

DURATION
2020 – 2021

PROXIMITY
8 IP. in 10km radius
10 km to Noi Bai Airport
40 km to Hanoi
180 km to Hai Phong Port

CNCTech Thang Long Planning
Thang Long Overview 2304

Specifications

04 plans: F1, F2, F3, F4A, and F4B.
  • F1-2-3
  • F4A
  • F4B

AREA
F1: 11,340 sq.m
F2: 9,720 sq.m
F3: 3,645 sq.m

HEIGHT & FLOOR LOADING
1st floor: 6 m, 4 ton / sq.m
2nd floor: 7 m, 1.5 ton / sq.m

WIDTH x LENGTH
TBC

COLUMN SPAN
TBC

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
3,000 kVA

OCCUPANCY
100%

CNCTech Thang Long

AREA
F1: 11,340 sq.m
F2: 9,720 sq.m
F3: 3,645 sq.m

HEIGHT & FLOOR LOADING
1st floor: 6 m, 4 ton / sq.m
2nd floor: 7 m, 1.5 ton / sq.m

WIDTH x LENGTH
TBC

COLUMN SPAN
TBC

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
3,000 kVA

OCCUPANCY
100%

CNCTech Thang Long

AREA
18,272 sq.m

HEIGHT & FLOOR LOADING
1st floor: 17,8 m, 4 ton / sq.m

WIDTH x LENGTH
TBC

COLUMN SPAN
TBC

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
3,000 kVA

OCCUPANCY
100%

CNCTech Thang Long

AREA
18,272 sq.m

HEIGHT & FLOOR LOADING
1st floor: 17,8 m, 4 ton / sq.m

WIDTH x LENGTH
TBC

COLUMN SPAN
TBC

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
3,000 kVA

OCCUPANCY
100%

CNCTech Thang Long

AREA
30,213 sq.m

HEIGHT & FLOOR LOADING
1st floor: 12.5 m, 4.0 ton / sq.m
Mezzanine: 5.5 m, 1.5 ton / sq.m
2nd floor: 9.2 m, 1.5 ton / sq.m

WIDTH x LENGTH
TBC

COLUMN SPAN
TBC

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
3,000 kVA

OCCUPANCY
25%

CNCTech Thang Long

AREA
30,213 sq.m

HEIGHT & FLOOR LOADING
1st floor: 12.5 m, 4.0 ton / sq.m
Mezzanine: 5.5 m, 1.5 ton / sq.m
2nd floor: 9.2 m, 1.5 ton / sq.m

WIDTH x LENGTH
TBC

COLUMN SPAN
TBC

FIRE FIGHTING 
Sprinklers, smoke detectors and fire extinguishers

POWER SUPPLY
3,000 kVA

OCCUPANCY
25%

CNCTech Thang Long

In the Neighborhood

Neighbor 1
Neighbor 3
Neighbor 2
Neighbor 4
Neighbor 5

Book a Visit

or ask for more detail.

    Workers at construction site

    Project Development

    2020

    03/2020

    Groundbreaking Ceremony of CNCTech Thang Long Complex.

    12/2020

    Lot F1, F2, F3 was handed over to customers.

    [bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

    2021

    01/2021

    Lot F4A was under construction. 

    06/2021

    Lot F4A was handed over to customers.

    [bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

    2022

    05/2022

    Lot F4B is under construction.

    08/2022

    Grand Opening Ceremony of CNCTech Thang Long Industrial Complex.

    [bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

    CONTACTLooking for a place
    for your business in Vietnam?

    WE CAN HELP WITH THAT

    Thang Long III IP., Binh Xuyen, Vinh Phuc, VN
    (+84) 866 505 509
    industrial@cnctech.vn

    © Copyright CNCTech Group. Privacy Policy